At Rovicon Energy Solutions Limited, our project portfolio reflects our commitment to delivering reliable, high-quality engineering and technical solutions across the oil and gas industry — from engineering, procurement, construction, installation, and commissioning (EPIC) to equipment servicing, refurbishment, and revamping.
Each project is executed with a focus on technical precision, operational efficiency, and long-term equipment reliability, as we work closely with clients to deliver tailored solutions that support their gas processing, compression, and production operations.
The following showcases a selection of our completed and ongoing projects, highlighting the scope of our technical capabilities and our continued partnership with leading companies in the energy sector.
Previous Work Experiences
Rovicon Energy Solutions Ltd has completed and continues to execute projects covering equipment procurement, installation, commissioning, servicing, fabrication, and produced water treatment across the oil and gas industry.
| Project / Work Experience | Client | Service Area | Status |
|---|---|---|---|
| Sale, Purchase, and Supply of Lean Gas & Booster Compressors | Egbaoma Gas Processing Company Limited | General Procurement | 2025, Ongoing |
| Servicing and Revamping of RBK WEMCO Unit | Belemaoil Producing Limited | Installation, Repair & Maintenance | 2025, Ongoing |
| Procurement of Pipes, Fittings, and Flanges | TotalEnergies EP Nigeria Limited | General Procurement | 2025, Ongoing |
| Servicing and Revamping of F/S WEMCO Unit | Aradel Energy | Installation, Repair & Maintenance | 2025, Completed |
| Procurement of Barton Chart Recorders and Accessories | Ari Industries (Cement Bond Nig. Ltd.) | General Procurement | 2025, Completed |
| Commissioning of Booster Compressor | Aradel Energy | Installation, Repair & Maintenance | 2024, Ongoing |
| Hiring of WBCO Tool Set | Cement Bond Nig. Ltd. | Production Services | 2024, Ongoing |
| Procurement of Barton Chart and Flow Meter Display Monitor | Ari Industries (Cement Bond Nig. Ltd.) | General Procurement | 2024, Ongoing |
| Procurement of 3-Phase Separator at Ogbele Flow Station | Niger Delta Petroleum Resources Limited | General Procurement; Installation | 2023, Completed |
| Procurement of Refurbished Compressor Package (Ariel JGH-4 & CAT3512) | Niger Delta Petroleum Resources Limited | General Procurement | 2023, Completed |
| Decommissioning and Reinstallation of Induced Gas Flotation (IGF) Vessel | Niger Delta Petroleum Resources Limited | Installation, Repair & Maintenance | 2021, Completed |
| Procurement of 100K BWP Produced Water Treatment Package (IGF Unit & Nutshell Filter) | Belemaoil Producing Ltd. — Buyer: Kaego Energy & Technology Corp. | General Procurement; Production Services | 2020, Completed |
| Operation and Maintenance of Produced Water Vessels (Hydrocyclone, WEMCO, Nutshell Filter) | Neconde Energy Ltd. — Odidi Flow Station | Installation, Repair & Maintenance; Production Services | 2020, Completed |
| Procurement and Installation of Oil-in-Water Analyzers | Belemaoil Producing Ltd. — Idama Platform | General Procurement; Production Services; Installation | 2019, Completed |
| Decommissioning and Reinstallation of Process Water Treatment Vessels (Skimmer Unit, CPI, IGF) | Belemaoil Producing Ltd. — Robertkiri Platform | Installation, Repair & Maintenance; Production Services | 2017, Completed |
| Decommissioning and Reinstallation of Process Water Treatment Vessels (Skimmer Unit, CPI, IGF) | Belemaoil Producing Ltd. — Idama Platform | Installation, Repair & Maintenance; Production Services | 2017, Completed |
| Decommissioning and Reinstallation of Process Water Treatment Vessels (Skimmer Unit, CPI, IGF) | Belemaoil Producing Ltd. — Inda Platform | Installation, Repair & Maintenance; Production Services | 2017, Completed |
Engineering, Procurement, Construction, Installation and Commissioning of Lean Gas & Booster Compressors
– Egbaoma Gas Processing Company Limited
In line with our commitment to providing reliable and efficient gas infrastructure solutions, Rovicon Energy Solutions Limited secured the contract for the engineering, procurement, construction, installation and commissioning of Lean Gas and Booster Compressors for Egbaoma Gas Processing Company Limited. The project is aimed at supporting the client’s gas processing and compression requirements through the provision of suitable, high-performance compressor equipment designed to ensure reliable gas handling, pressure boosting, and efficient gas delivery within the facility.
The project demonstrates Rovicon Energy Solutions Limited’s capability to construct, install, and commission specialized gas compression equipment to meet the operational requirements of gas processing facilities.
Servicing and Revamping of RBK WEMCO Unit
– Belemaoil Producing Limited
To restore equipment reliability and improve operational performance, Rovicon Energy Solutions Limited carried out the servicing and revamping of an RBK WEMCO Unit for Belemaoil Producing Limited. The project involved a comprehensive assessment and refurbishment of the unit, with attention given to its mechanical condition, operational performance, and overall serviceability.
The successful completion of this project highlights Rovicon Energy Solutions Limited’s technical capability in equipment maintenance, refurbishment, and revamping within the oil and gas industry. The intervention helped restore the RBK WEMCO Unit to a more reliable operating condition while supporting the client’s objective of maintaining efficient and dependable production operations.
Key Features:
- Comprehensive inspection and condition assessment of the RBK WEMCO Unit
- Servicing and refurbishment of critical equipment components
- Identification and replacement of worn or defective parts
- Cleaning and restoration of equipment assemblies
- Mechanical maintenance and corrective works
- Reassembly and preparation of the unit for operation
- Functional and performance testing after servicing
- Improved equipment reliability and operational readiness
- Extension of equipment service life through effective refurbishment
EPIC Booster Compressor Package
– Aradel Energy
In line with our commitment to providing reliable and high-performance energy infrastructure solutions, Rovicon Energy Solutions Limited executed a major gas compression project for Aradel Energy, involving the refurbishment, supply, integration, installation, and commissioning of high-capacity gas compressor packages and associated auxiliary systems.
The project was designed to enhance gas handling and compression capacity, supporting the reliable transportation and processing of natural gas while improving operational efficiency, equipment reliability, and overall production performance.
Servicing and Revamping of F/S WEMCO Unit
– Aradel Energy
The F/S WEMCO Unit servicing and revamping project for Aradel Energy involved the comprehensive maintenance, refurbishment, and restoration of the equipment to improve its operational condition and reliability. Rovicon Energy Solutions Limited provided the required technical services to address identified equipment deficiencies, restore critical components, and prepare the unit for continued service.
Through our technical maintenance and equipment rehabilitation services, Rovicon Energy Solutions Limited continues to support clients with practical and cost-effective solutions for maintaining and optimizing their oil and gas assets.


